Category: Insights

  • What Primes Check in a Tier 2 Supplier

    Insights · Qualification

    What primes check

    Tier 2 qualification is not a single test. It is a set of questions a prime asks before it trusts a new supplier with its programme, and they are more about reliability and risk than about your sales pitch. Knowing the questions in advance is the difference between presenting as a serious supplier and presenting as a hopeful one.

    Qualification is risk management, not procurement theatre

    When a prime evaluates a potential Tier 2 supplier, it is not running a formality. It is managing risk. A prime’s own delivery, reputation, and contractual obligations depend on its supply chain performing, so before it qualifies you, it is asking, in effect, can we depend on this company, and what is the risk if we cannot?

    Everything a prime checks flows from that question. Understanding it reframes qualification from a hurdle to clear into a case to make.

    The questions behind qualification

    A prime’s evaluation typically tests a consistent set of areas. The labels vary; the substance is stable.

    • Quality management. Do you operate a credible quality system, ISO 9001 as a base, and increasingly AQAP-2110, the NATO quality standard? Can you demonstrate first-article inspection discipline (AS9102) where it applies? Quality credentials are table stakes: their absence ends the conversation, their presence merely opens it.
    • Compliance and export control. Can you lawfully manufacture and supply what the programme requires? Are your export-control authorisations in place or credibly under way? A prime cannot place controlled work with a supplier who cannot legally handle it.
    • Operational capability and capacity. Can you make it, to specification, at the volume and rate the programme needs, not once, but reliably? Capacity headroom and process control matter as much as peak capability.
    • Supply-chain control. Do you understand and control your own supply base, including origin and the flow-down of contractual requirements to your suppliers? A prime is qualifying your chain, not just your factory.
    • Commercial and contractual readiness. Can you price defensibly, structure a contract, and meet the commercial terms a prime works under? Commercial immaturity is a real risk to a prime, even when the engineering is sound.
    • Financial stability. Are you a supplier the prime can rely on for the life of the programme? A qualified supplier that fails financially mid-programme is a serious problem, and primes assess for it.
    AQAP-2110 requires ISO 9001 as a foundation; primes strongly prefer it but do not always mandate it.

    Why “we make excellent parts” is not enough

    The most common misjudgement among capable industrial companies is assuming that engineering quality carries the qualification. It does not. A prime can believe your parts are excellent and still decline to qualify you because your export-control position is unresolved, your supply chain is opaque, or your commercial process is immature.

    Qualification is decided across all of these dimensions at once. A decisive weakness in any one can outweigh strength in the others, which is precisely why a structured, all-dimensions readiness assessment is more useful than deep confidence in a single strength.

    What to do about it

    1. Self-assess against the full set, honestly. Score yourself across every dimension a prime checks, not just the ones you are strong in. The decisive gap is usually the one you are not looking at.
    2. Fix the table-stakes items first. Quality certification and export-control readiness are gating. Until they are credibly in hand, the other strengths cannot be brought to bear.
    3. Present a case, not a pitch. A prime is buying down risk. Walk in able to show, with evidence, that you are a low-risk, reliable supplier across every dimension it cares about. That is what qualification in reality rewards.

    The bottom line

    Primes do not qualify suppliers on enthusiasm or even on engineering alone. They qualify on demonstrated reliability across quality, compliance, operations, supply chain, commercial maturity, and financial stability. Know the questions before you are asked them, build the evidence in advance, and you arrive as a serious supplier rather than a hopeful one.

  • EU-Origin Content for Defence, Explained

    Insights · Compliance

    EU-origin content, explained

    A growing share of European defence funding carries a condition that catches industrial suppliers off guard: a minimum proportion of EU-origin content. Understand the threshold early and it becomes a design parameter you can plan around. Discover it late and it can disqualify an otherwise strong bid.

    Why origin suddenly matters

    European defence procurement is increasingly routed through instruments designed to strengthen the European defence industrial base, and those instruments come with strings attached to where value is created. The headline string is origin: to qualify for certain EU defence funding, a product must contain a minimum proportion of content originating in the EU.

    For a supplier, this is not a compliance footnote. It can determine whether your product is eligible for a programme at all, and eligibility is decided by your supply chain, not your intentions.

    The threshold to plan around

    A common requirement is that at least 65% of the content be of EU origin to qualify under instruments such as EDIP and the SAFE programme.

    The ≥65% EU-origin figure reflects requirements associated with EDIP and SAFE. Confirm the exact threshold and definition against the current regulation and the specific programme rules at the time of bidding, these instruments are evolving.

    The precise calculation, what counts as “content,” how origin is determined, how the percentage is measured, is defined in the relevant regulation and can differ by instrument. The number to hold in your head for planning is roughly two-thirds EU-origin, with the detail confirmed against the live rules for the programme you are targeting.

    Where suppliers get caught

    The trap is structural. A company can have excellent capability, the right certifications, and a willing prime, and still fall short on origin because a critical component or sub-assembly is sourced from outside the EU. By the time that surfaces during a bid, re-sourcing is slow and expensive, and the programme window may have closed.

    Origin sits in your supply chain, often several tiers down, and is frequently invisible until someone goes looking. That is exactly the kind of decisive, hard-to-reverse gap a readiness review is designed to surface before it costs you a programme.

    What to do about it

    1. Map your origin position early. Know, at least approximately, what proportion of your product’s content originates in the EU, including key components and sub-assemblies sourced through your own suppliers.
    2. Treat origin as a design and sourcing parameter. If a target programme requires EU-origin content and you are below the threshold, the time to plan a re-sourcing path is before you bid, not during.
    3. Confirm the live rules for your specific programme. Thresholds and definitions are set in regulation and are evolving as European defence-industrial policy develops. Plan around the principle; verify the exact figure against current rules.

    The bottom line

    EU-origin content is one of the clearest examples of a requirement that is cheap to plan for and expensive to discover late. Knowing your origin position early turns a potential disqualifier into a manageable design parameter, and protects you from investing in a bid your supply chain cannot support.

  • What Determines Your Defence-Entry Timeline (Not the Licence)

    Insights · Timelines

    What determines your defence-entry timeline (it isn’t the licence)

    A myth circulates among industrial companies entering the defence supply chain: that the Swedish manufacturing licence is a six-month bottleneck you must start first. The licence does need to come early, but as a prerequisite to sequence, not a long duration to wait out. The genuinely long poles in your timeline lie elsewhere.

    The myth, and why it matters

    Companies new to defence often hear that export-control licensing is the great bottleneck, that the manufacturing licence takes the better part of a year and therefore dominates the plan. It is a tidy story, and it is wrong. Believing it leads to two errors: over-weighting a step that is really fast, and under-weighting the steps that genuinely take a year or more.

    What the manufacturing licence really requires

    In Sweden, manufacturing or supplying war materiel requires a basic operating authorisation, a tillverkningstillstånd, from the Inspectorate of Strategic Products (ISP). It is a genuine prerequisite: you cannot lawfully manufacture war materiel without it, so it belongs early in any plan.

    But it is not slow. According to ISP’s own 2024 annual report, the large majority of war-materiel cases are decided within a month, roughly two-thirds within 30 days, and close to half within 14. ISP describes its processing times as short by international standards.

    Source: ISP Årsredovisning 2024, processing-time table for krigsmaterielärenden (calendar days, war-materiel category as a whole). Confirm the current position for your specific case type at application.

    The practical implication: treat the licence as something to initiate early in the sequence, not as a multi-month wait that governs your delivery date. It rarely does.

    A word on dual-use and investment screening

    If your products are dual-use (PDA) rather than war materiel, ISP’s export-licence processing runs longer, the majority of dual-use cases took more than 30 days in 2024, though still measured in weeks rather than half-years.

    Separately, Sweden’s foreign-direct-investment screening does carry a six-month figure, but only for cases ISP opens for deep review, where it has three months, extendable to six on special grounds. Routine notifications run under a 25-working-day limit. This is investment control, not a manufacturing licence, and it applies to acquirers, not to a supplier seeking to manufacture. Conflating the two is the likely root of the myth.

    Where the real long poles are

    If the licence is weeks, what in reality takes a year? Two things, and a credible plan is built around them.

    The first is the quality-certification chain. Primes increasingly expect AQAP-2110, the NATO quality standard, which requires ISO 9001 as its foundation. Building that chain from a standing start is realistically a multi-quarter effort, on StromGold’s planning assumptions, around nine months. (Internal planning figure; varies with the maturity of an existing quality system.)

    The second, and usually the longest, is prime qualification itself. Becoming a qualified supplier, audits, first-article inspection, process validation, onboarding, commonly runs twelve to fifteen months from first serious engagement. (Planning range based on StromGold engagement experience; programme-dependent.) This, not the licence, is the constraint that most often sets the date of a first defence delivery.

    The bottom line

    The constraint that sets your defence-entry timeline is not the manufacturing licence. ISP decides most war-materiel cases within a month. The real clock is the quality-certification chain and, above all, prime qualification, the things that take a year or more. Plan against those, sequence the licence early but in proportion, and your timeline will survive contact with a prime.

  • What Is a Defence Supplier Readiness Review?

    Insights · Readiness

    What a Defence Supplier Readiness Review really is

    A feasibility study tells you whether something is possible. A readiness review tells you whether you are ready to do it, and what it takes if you are not. For an industrial company eyeing the defence supply chain, that distinction is the difference between a decision you can stake capital on and a document that sits in a drawer.

    The question most companies skip

    When an industrial company first considers becoming a defence supplier, the instinct is to ask can we win work? It is the wrong first question. The right one is are we ready to be a supplier at all, and if not, what would close the gap, and is closing it worth it?

    A Defence Supplier Readiness Review answers that directly. It is not market research, and it is not a feasibility study. It is an evidence-based assessment of your company’s readiness across three things primes in fact evaluate: capability, compliance, and commercial foundations. The output is a verdict you can act on, with the reasoning shown.

    Feasibility study versus readiness review

    A feasibility study asks whether a market opportunity exists and whether, in principle, a company could pursue it. It is outward-looking and frequently optimistic, its job is to size a prize.

    A readiness review is inward-looking and deliberately unsentimental. It measures your company against the standard a prime applies before it qualifies a supplier, names the gaps, rates them by severity, and tells you whether the business case survives once the real costs and timelines are in front of you. It can, and sometimes should, conclude not yet.

    What a readiness review covers

    A rigorous review assesses readiness across the dimensions that decide qualification, quality management, export-control and regulatory compliance, operations and capacity, supply-chain control, and commercial and contractual readiness, among others. Each is scored against an explicit standard rather than a general impression, so the result is defensible to your board and, eventually, to a prime.

    The deliverables are built to be used, not filed: a capability scorecard against a defined threshold, a gap analysis with severity ratings, a view of where you can realistically compete, and a prioritised roadmap if the verdict is proceed.

    Why the verdict matters more than the volume of analysis

    The value of a readiness review is not the quantity of analysis. It is the quality of the judgement at the end. A review that can only return yes is worthless, it is a sales document wearing the costume of an assessment. The discipline is in being willing to say not ready, and in showing the evidence that makes that call credible. That is also why independence matters: a readiness verdict is only worth acting on if the party giving it has no incentive to manufacture a yes.

    The bottom line

    If you are considering the defence supply chain, run the readiness question before the opportunity question. Knowing honestly where you stand, and what it would take to stand somewhere better, is the foundation every subsequent decision rests on. A readiness review gives you that foundation. A feasibility study, however thorough, does not.